| PUB.NUMBER | PAGES | CD- ROM | PROPONENT | TITLE | PUB.DATE |
| EM 200-1-1 | 504 | CEMP | Validation of Analytical Chemistry Laboratories | 01 Jul 94 | |
| EM 200-1-2 | 132 | CEMP-RT | Technical Project Planning (TPP) Process | 31 Aug 98 | |
| EM 200-1-3 | 376 | CEMP-RT | Requirements for the Preparation of Sampling and Analysis Plans | 01 Feb 01 | |
| EM 200-1-4 (Volume I) | 187 | CEMP-RT | Risk Assessment Handbook: Volume I - Human Health Evaluation | 31 Jan 99 | |
| EM 200-1-4 (Volume II) | 409 | CEMP-RT | Risk Assessment Handbook: Volume II - Environmental Evaluation | 30 Jun 96 | |
| EM 200-1-5 | 373 | CEMP-RT | Design, Installation and Utilization of Fixed-Fenceline Sample Collection and Monitoring Systems | 01 Oct 97 | |
| EM 200-1-6 | 126 | CEMP-RT | Chemical Quality Assurance for HTRW Projects | 10 Oct 97 | |
| EM 200-1-7 | 113 | CEMP-RT/ CECW-E |
Performance Evaluation (PE) Program | 01 Feb 01 | |
| EM 200-1-10 | 129 | CEMP-RT/ CECW-E |
Environmental Quality - Guidance for Evaluating Performance-Based Chemical Data | 30 Jun 05 | EM 385-1-1 | 977 | CESO-ZA | Safety - Safety and Health Requirements | 03 Nov 03 |
| EM 385-1-80 | 186 | CESO-I | Radiation Protection Manual | 30 May 97 | |
| EM 500-1-24 | 136 | CECW-OE-E | Corps of Engineers Exercise Manual (COREM) - ANNEX L Classified CONFIDENTIAL -(Stocked and Issued byProponent) | 01 Sep 87 | |
| EM 1110-1-400 | 203 | CECW-CO | Recreation Facility and Customer Services Standards | 01 Nov 04 | |
| EM 1110-1-501 | 003 | CEMP-ET | Process Design Manual for Land Treatment of Municipal Wastewater | 20 May 82 | |
| EM 1110-1-502 | 382 | CEMP-R/ CECW-E |
Technical Guidelines for Hazardous & Toxic Waste Treatment and Cleanup Activities | 30 Apr 94 | |
| EM 1110-1-1000 | 371 | CECW-EE | Photogrammetric Mapping | 01 Jul 02 | |
| EM 1110-1-1002 | 054 | CECW-EP | Survey Markers and Monumentations | 14 Sep 90 | |
| EM 1110-1-1003 | 469 | CECW-EE | NAVSTAR Global Positioning System Surveying | 01 Jul 03 | |
| EM 1110-1-1004 | 102 | CECW-EE | Geodetic and Control Surveying | 01 June 02 | |
| EM 1110-1-1005 | 108 | CECW-EP | Topographic Surveying | 31 Aug 94 | |
| EM 1110-1-1200 | 051 | CECW-ET | Conceptual Site Models for Ordnance and Explosives (OE) and Hazardous, Toxic, and Radioactive Waste (HTRW) Projects | 03 Feb 03 | |
| EM 1110-1-1802 | 317 | CECW-EG | Geophysical Exploration for Engineering and Environmental Investigations | 31Aug 95 | |
| EM 1110-1-1804 | 148 | CECW-ET | Geotechnical Investigations, ENG 1836, ENG 1836A | 1 Jan 01 | |
| EM 1110-1-1904 | 204 | CECW-EP | Settlement Analysis | 30 Sep 90 | |
| EM 1110-1-1905 | 201 | CECW-EG | Bearing Capacity of Soils | 30 Oct 92 | |
| EM 1110-1-2009 | 052 | CECW-EG | Architectural Concrete | 31 Oct 97 | |
| EM 1110-1-2907 | 205 | CECW-EG | Rock Reinforcement | 15 Feb 80 | |
| EM 1110-1-2908 | 065 | CECW-EG | Rock Foundations | 30 Nov 94 | |
| EM 1110-1-2909 | 82 | CECW-EP | Geospatial Data and Systems | 01 Aug 96 (original) 01 Jul 98 (change 2) | |
| EM 1110-1-3500 | 032 | CECW-EG | Chemical Grouting | 31 Jan 95 | |
| EM 1110-1-4000 | 068 | CEMP-RT/ CECW-EG |
Monitoring Well Design, Installation, and Documentation at Hazardous Toxic , and Radioactive Waste Sites | 1 Nov 98 | |
| EM 1110-1-4001 | 424 | CEMP-ET | Soil Vapor Extraction and Bioventing | 03 Jun 02 | |
| EM 1110-1-4005 | 154 | CEMP-RT | In-Situ Air Sparging | 15 Sep 97 | |
| EM 1110-1-4006 | 260 | CEMP-RT | Removal of Underground Storage Tanks (USTs) | 30 Sep 98 | |
| EM 1110-1-4007 | 286 | CEMP-RA | Safety and Health Aspects of Hazardous, Toxic, and Radioactive Waste Remediation Technologies | 15 Aug 03 | |
| EM 1110-1-4008
Change 1 (16 Sep 02) Errata Sheet 1 (10 Jan 03) |
245 | CEMP-RA | Liquid Process Piping | 05 May 99 | |
| EM 1110-1-4009 | 184 | CEMP-RA | Ordnance and Explosives | 23 Jun 00 | |
| EM 1110-1-4010 | 285 | CEMP-R | Multi-Phase Extraction | 01 Jun 99 | |
| EM 1110-1-4011 | 70 | CEMP-RA | Construction Quality Assurance (CQA) Plan - Requirements for Hazardous Waste Landfills | 01 Oct 99 | |
| EM 1110-1-4012 | 101 | CECW-ET | Engineering and Design: Precipitation/Coagulation/Flocculation | 15 Nov 01 | |
| EM 1110-2-38 | 008 | CECW-ED | Environmental Quality in Design of Civil Works Projects | 03 May 71 | |
| EM 1110-2-301 | 013 | CECW-EG/ CEMP-ET |
Guidelines for Landscape Planting at Floodwalls, Levees & Embankment Dams | 01 Jan 00 | |
| EM 1110-2-410 | 107 | CECW-ED | Design of Recreation Areas and Facilities - Access and Circulation | 31 Dec 82 | |
| EM 1110-2-501 | 221 | CECW-ET | Small Wastewater Systems | 01 Feb 99 | |
| EM 1110-2-503 | 83 | CECW-ET | Design of Small Water Systems | 27 Feb 99 | |
| EM 1110-2-504 | 057 | CECW-ED | Land Treatment Systems Operation and Maintenance | 30 Nov 83 | |
| EM 1110-2-1003
Change 1 (01 Apr 04) |
580 | CECW-EE CECW-OD |
Hydrographic Surveying | 01 Jan 02 | |
| EM 1110-2-1009 | 292 | CECW-EE | Engineering and Design - Structural Deformation Surveying | 01 Jun 02 | |
| EM 1110-2-1100 |
78 | CECW-EW | Coastal Engineering Manual - Part I | 30 Apr 02 | |
| EM 1110-2-1100 |
608 | CECW-EW | Coastal Engineering Manual - Part II | 30 Apr 02 | |
| EM 1110-2-1100 |
472 | CECW-EW | Coastal Engineering Manual - Part III | 30 Apr 02 | |
| EM 1110-2-1100 |
230 | CECW-EW | Coastal Engineering Manual - Part IV | 30 Apr 02 | |
| EM 1110-2-1100 |
667 | CECW-EW | Coastal Engineering Manual - Part V | 31 Jul 03 | |
| EM 1110-2-1100 Appendix A, Glossary |
095 | CECW-EW | Coastal Engineering Manual - Appendix A - Glossary of Coastal Terminology | 31 Jul 03 | |
| EM 1110-2-1201 | 191 | CECW-EH-W | Reservoir Water Quality Analyses | 30 Jun 87 | |
| EM 1110-2-1202 | 123 | CECW-EH-W | Environmental Engineering for Deep-Draft Navigation Projects | 29 May 87 | |
| EM 1110-2-1204 | 191 | CECW-EH-W | Environmental Engineering for Coastal Shore Protection | 10 Jul 89 | |
| EM 1110-2-1205 | 096 | CECW-EH-W | Environmental Engineering and Local Flood Control Channels | 15 Nov 89 | |
| EM 1110-2-1206 | 039 | CECW-EH-W | Environmental Engineering for Small Boat Basins | 31 Oct 93 | |
| EM 1110-2-1304 | 044 | CECW-EE | Civil Works Construction Cost Index System (CWCCIS) | 31 Mar 00 Tables revised: | |
| EM 1110-2-1406 | 142 | CECW-EH | Runoff from Snowmelt | 31 Mar 98 | |
| EM 1110-2-1411 | 036 | CECW-EH-Y | Standard Project Flood Determinations (ENG BUL 52-8) | 01 Mar 65 | |
| EM 1110-2-1413 | 089 | CECW-EH-Y | Hydrologic Analysis of Interior Areas | 15 Jan 87 | |
| EM 1110-2-1415 | 149 | CECW-EH-Y | Hydrologic Frequency Analysis | 05 Mar 93 | |
| EM 1110-2-1416 | 168 | CECW-EH-Y | River Hydraulics | 15 Oct 93 | |
| EM 1110-2-1417 | 213 | CECW-EH-Y | Flood Run-off Analysis | 31 Aug 94 | |
| EM 1110-2-1418 | 114 | CECW-EH-D | Channel Stability Assessment for Flood Control Projects | 31 Oct 94 | |
| EM 1110-2-1419 | 050 | CECW-EH-Y | Hydrologic Engineering Requirements for Flood Damage Reduction Studies | 31 Jan 95 | |
| EM 1110-2-1420 | 148 | CECW-EH-Y | Hydrologic Engineering Requirements for Reservoirs | 31 Oct 97 | |
| EM 1110-2-1421 | 121 | CECW-EH | Groundwater Hydrology | 28 Feb 99 | |
| EM 1110-2-1424 | 186 | CECW-ET | Lubricant and Hydraulic Fluids | 28 Feb 99 | |
| EM 1110-2-1601 | 080 | CECW-EH-D | Hydraulic Design of Flood Control Channels Change 1 ENG 4794-R | 30 Jun 94 | |
| EM 1110-2-1602 | 199 | CECW-EH-D | Hydaulic Design of Reservoir Outlet Works | 15 Oct 80 | |
| EM 1110-2-1603 | 169 | CECW-EH-D | Hydraulic Design of Spillways | 16 Jan 90 | |
| EM 1110-2-1604 | 075 | CECW-EH-D | Hydraulic Design of Navigation Locks | 30 Jun 95 | |
| EM 1110-2-1605 | 192 | CECW-EH-D | Hydraulic Design of Navigation Dams | 12 May 87 | |
| EM 1110-2-1606 | 014 | CECW-EH-D | Hydraulic Design - Surges in Canals Change 1 | 01 Mar 49 | |
| EM 1110-2-1607 | 154 | CECW-EH-D | Tidal Hydraulics | 15 Mar 91 | |
| EM 1110-2-1610 | 058 | CECW-EH-D | Hydraulic Design of Lock Culvert Valves | 15 Aug 75 | |
| EM 1110-2-1611 | 138 | CECW-EH-D | Layout and Design of Shallow-Draft Waterways with Change 3 (31 Jul 97) and Errata Sheet (27 August 97) | 31 Dec 80 | |
| EM 1110-2-1612 | 377 | CECW-EH | Ice Engineering | 30 Oct 02 | |
| EM 1110-2-1613 | 122 | CECW-EH | Hydraulic Design Guidance for Deep-Draft Navigation Projects | 8 Apr 83 | |
| EM 1110-2-1614 | 110 | CECW-EH-D | Design of Coastal Revetments, Seawalls and Bulkheads | 30 Jun 95 | |
| EM 1110-2-1615 | 131 | CECW-EH-D | Hydraulic Design of Small Boat Harbors | 25 Sep 84 | |
| EM 1110-2-1619 | 61 | CECW-EH | Risk-Based Analysis for Flood Damage Reduction Studies | 1 Aug 96 | |
| EM 1110-2-1701 | 825 | CECW-EH | Hydropower Change 1 | 31 Dec 85 | |
| EM 1110-2-1810 | 291 | CECW-EG | Coastal Geology | 31 Jan 95 | |
| EM 1110-2-1901 | 389 | CECW-EG | Seepage Analysis and Control for Dams CH 1 | 30 Sep 86 (original) 30 Apr 93 (change 1) | |
| EM 1110-2-1902 | 205 | CECW-EW | Slope Stability | 31 Oct 03 | |
| EM 1110-2-1906 | 407 | CECW-EG | Laboratory Soils Testing CH 1-2, ENG Form 2086, ENG Form 2087, ENG Form 2088, ENG Form 2089, ENG Form 2090, ENG Form 2091, ENG Form 2092, ENG Form 3659, ENG Form 3835, ENG Form 3836, ENG Form 3837, ENG Form 3838, ENG Form 3839, ENG Form 3840, ENG Form 3841, ENG Form 3843, ENG Form 3844, ENG Form 3845, ENG Form 3846, ENG Form 3847, ENG Form 3848, ENG Form 3849, ENG Form 3850, ENG Form 3851, ENG Form 3852, ENG Form 3853, ENG Form 3854, ENG Form 3855, ENG Form 3856, ENG Form 3857, ENG Form 3858, ENG Form 4055, ENG Form 4056, ENG Form 4334, ENG Form 4663-R, ENG Form 4664-R, ENG Form 4665-R, ENG Form 4665A-R, ENG Form 4666-R, ENG Form 4667-R, ENG Form 4668-R | 30 Nov 70 (original) 20 Aug 86 (change) | |
| EM 1110-2-1908 | 083 | CECW-EG | Instrumentation of Embankment Dams and Levees | 30 Jun 95 | |
| EM 1110-2-1909 | 044 | CECW-EG | Calibration of Laboratory Soils Testing Equipment | 01 Dec 70 (original) 10 Mar 86 (change 1) | |
| EM 1110-2-1911 | 100 | CECW-EG | Construction Control for Earth & Rock-Fill Dams | 30 Sep 95 | |
| EM 1110-2-1913 | 164 | CECW-EG | Design & Construction of Levees | 30 Apr 00 | |
| EM 1110-2-1914 | 091 | CECW-EG | Design, Construction and Maintenance of Relief Wells | 29 May 92 | |
| EM 1110-2-2000 | 124 | CECW-EG | Standard Practice for Concrete for Civil Works Structures Change 2 | 01 Feb 94(original) 31 Mar 01 (change 2) | |
| EM 1110-2-2002 | 184 | CECW-ED | Evaluation and Repair of Concrete Structures | 30 Jun 95 | |
| EM 1110-2-2005 | 063 | CECW-EG | Standard Practice for Shotcrete | 31 Jan 93 | |
| EM 1110-2-2006 | 077 | CECW-EG | Roller-Compacted Concrete | 15 Jan 00 | |
| EM 1110-2-2007 | 053 | CECW-ED | Structural Design of Concrete Lined Flood Control Channels | 30 Apr 95 | |
| EM 1110-2-2102 | 002 | CECW-EG | Waterstops and Other Preformed Joint Materials for Civil Works Structures | 30 Sep 95 | |
| EM 1110-2-2104
Change 1 |
075 | CECW-ED | Strength Design for Reinforced - Concrete Hydraulic Structures | 30 Jun 92
20 Aug 03 | |
| EM 1110-2-2105 | 006 | CECW-ED | Design of Hydraulic Steel Structures Change 1 | 31 May 94 | |
| EM 1110-2-2200 | 088 | CECW-ED | Gravity Dam Design | 30 Jun 95 | |
| EM 1110-2-2201 | 238 | CECW-ED | Arch Dam Design | 31 May 94 | |
| EM 1110-2-2300 | 130 | CECW-EG | Engineering and Design - General Design and Construction Considerations for Earth and Rock-Fill Dams | 30 Jul 04 | |
| EM 1110-2-2301 | 094 | CECW-EG | Test Quarries and Test Fills | 30 Sep 94 | |
| EM 1110-2-2302 | 060 | CECW-EG | Construction With Large Stone | 24 Oct 90 | |
| EM 1110-2-2400 | 143 | CECW | Structural Design and Evaluation of Outlet Works | 02 Jun 03 | |
| EM 1110-2-2502 | 447 | CECW-ED | Retaining and Flood Walls | 29 Sep 89 | |
| EM 1110-2-2503 | 184 | CECW-EP | Design of Sheet Pile Cellular Structures Cofferdams & Retaining Structures | 29 Sep 89 | |
| EM 1110-2-2504 | 074 | CECW-ED | Design of Sheet Pile Walls | 31 Mar 94 | |
| EM 1110-2-2602 | 185 | CECW-ED | Planning and Design of Navigation Locks | 30 Sep 95 | |
| EM 1110-2-2607 | 117 | CECW-ED | Planning and Design of Navigation Dams | 31 July 1995 | |
| EM 1110-2-2608 | 011 | CECW-EE | Navigation Locks - Fire Protection Provisions | 28 Feb 94 | |
| EM 1110-2-2610
Change 1 02 Apr 04 |
322 | CECW-ET | Lock and Dam Gate Operating and Control Systems | 12 Dec 03 02 Apr 04 | |
| EM 1110-2-2611 | 061 | CECW-EW | Engineering for Prefabricated Construction of Navigation Projects | 01 Feb 04 | |
| EM 1110-2-2701 | 056 | CECW-ED | Vertical Lift Gates | 30 Nov 97 | |
| EM 1110-2-2702 | 112 | CECW-ET | Design of Spillway Tainter Gates | 01 Jan 00 | |
| EM 1110-2-2703 | 272 | CECW-ED | Lock Gates and Operating Equipment | 30 Jun 94 | |
| EM 1110-2-2704 | 106 | CECW-CE | Cathodic Protection Systems for Civil Works Structures | 12 July 2004 | |
| EM 1110-2-2705 | 109 | CECW-ED | Structural Design of Closure Structures for Local Flood Protection Projects | 31 Mar 94 | |
| EM 1110-2-2901 | 236 | CECW-ED | Tunnels and Shafts in Rock | 30 May 97 | |
| EM 1110-2-2902 | 085 | CECW-ED | Conduits, Culverts and Pipes | 31 Oct 97 (original) 31 Mar 98 (change 1) | |
| EM 1110-2-2906 | 189 | CECW-ED | Design of Pile Foundations | 15 Jan 91 | |
| EM 1110-2-2907 | 217 | CECW-EE | Engineering and Design - Remote Sensing | 01 Oct 03 | |
| EM 1110-2-3001 | 041 | CECW-ED | Planning and Design of Hydroelectirc Power Plant Structures | 30 Apr 95 | |
| EM 1110-2-3006 | 114 | CECW-EE | Hydroelectric Power Plants Electrical Design | 30 Jun 94 | |
| EM 1110-2-3102 | 033 | CECW-EE | General Principles of Pumping Station Design and Layout | 28 Feb 95 | |
| EM 1110-2-3104 | 071 | CECW-ED | Structural and Architectural Design of Pumping Stations | 30 Jun 89 | |
| EM 1110-2-3105 | 169 | CECW-ET | Mechanical and Electrical Design of Pumping Stations | 30 Mar 94 (original) 31 Aug 94 (change 1) 30 Nov 99 (change 2) | |
| EM 1110-2-3200
Change 1 - 02 Apr 04 |
078 | CECW-EE | Wire Rope Selection Criteria for Gate-Operating Devices | 30 Sep 98 02 Apr 04 | |
| EM 1110-2-3400 | 158 | CECW-EE | Painting: New Construction and Maintenance | 30 Apr 95 | |
| EM 1110-2-3401 | 85 | CECW-ET | Thermal Spraying: New Construction and Maintenance | 29 Jan 99 | |
| EM 1110-2-3506 | 159 | CECW-EG | Grouting Technology | 20 Jan 84 | |
| EM 1110-2-3600 | 226 | CECW-EH-W | Management of Water Control Systems, S2, S3, S3W, S10,S11, S12, S5001B, S5001D | 30 Nov 87 | |
| EM 1110-2-3800 | 146 | CECW-EG | Systematic Drilling and Blasting for Surface Excavations | 01 Mar 72 | |
| EM 1110-2-4000 | 268 | CECW-EH-Y | Sedimentation Investigations of Rivers and Reservoirs, ENG 1787 | 31 Oct 95 | |
| EM 1110-2-4205 | 111 | CECW-EE | Hydroelectric Power Plants Mechanical Design CH 1 (31 Jul 96) | 30 Jun 95 | |
| EM 1110-2-4300 | 305 | CECW-ED | Instrumentation for Concrete Structures | 15 Sep 80 (original) 30 Nov 87 (change 1) | |
| EM 1110-2-5025 | 093 | CECW-EH-D | Dredging & Dredged Material Disposal | 25 Mar 83 | |
| EM 1110-2-5026 | 284 | CECW-EH-D | Beneficial Uses of Dredged Material | 30 Jun 87 | |
| EM 1110-2-5027 | 243 | CECW-EH-D | Confined Disposal of Dredged Material | 30 Sep 87 | |
| EM 1110-2-6050 | 247 | CECW-ET | Response Spectra and Seismic Analysis for Concrete Hydraulic Structures | 30 Jun 99 | |
| EM 1110-2-6051 | 401 | CECW-EW | Engineering and Design - Time-History Dynamic Analysis of Concrete Hydraulic Structures | 22 Dec 03 | |
| EM 1110-2-6054 | 133 | CECW-ED | Inspection, Evaluation and Repair of Hydraulic Steel Structures | 01 Dec 01 | |
| EM 1110-3-130 | 043 | CEMP-ET | Geometrics for Roads, Streets, Walks and Open Storage Areas - Mobilization Construction | 09 Apr 84 | |
| EM 1110-3-131 | 045 | CEMP-ET | Flexible Pavements for Roads, Streets, Walks and Open Storage Areas - Mobilization for Construction | 09 Apr 84 | |
| EM 1110-3-132 | 040 | CEMP-ET | Rigid Pavements for Roads, Streets, Walks and Open Storage Areas - Mobilization Construction | 09 Apr 84 | |
| EM 1110-3-135 | 036 | CEMP-ET | Standard Practice for Concrete Pavements - MobilizationConstruction | 09 Apr 84 | |
| EM 1110-3-136 | 203 | CEMP-ET | Drainage and Erosion Control - Mobilization Construction | 09 Apr 84 | |
| EM 1110-3-137 | 032 | CEMP-ET | Soil Stabilization for Pavements - Mobilization Construction | 09 Apr 84 | |
| EM 1110-3-138 | 98 | CEMP-ET | Pavement Criteria for Seasonal Frost Conditions -Mobilization Construction | 09 Apr 84 | |
| EM 1110-3-141 | 102 | CEMP-ET | Airfield Flexible Pavement - Mobilization Construction | 09 Apr 84 | |
| EM 1110-3-142 | 083 | CEMP-ET | Airfield Rigid Pavement - Mobilization Construction | 09 Apr 84 | |
| EM 1110-3-150 | 054 | CEMP-ET | Storage Depots - Mobilization Construction | 09 Apr 84 | |
| EM 1110-3-152 | 035 | CEMP-ET | Railroads - Mobilization Construction | 09 Apr 84 | |
| EM 1110-3-160 | 015 | CEMP-ET | Water Supply, General Considerations - Mobilization Construction | 09 Apr 84 | |
| EM 1110-3-161 | 035 | CEMP-ET | Water Supply, Water Sources - Mobilization Construction | 09 Apr 84 | |
| EM 1110-3-162 | 059 | CEMP-ET | Water Supply, Water Treatment - Mobilization Construction | 09 Apr 84 | |
| EM 1110-3-163 | 020 | CEMP-ET | Water Supply, Water Storage - Mobilization Construction | 09 Apr 84 | |
| EM 1110-3-164 | 056 | CEMP-ET | Water Supply, Water Distribution - Mobilization Construction | 09 Apr 84 | |
| EM 1110-3-166 | 038 | CEMP-ET | Water Supply, Fire Protection - Mobilization Construction | 09 Apr 84 | |
| EM 1110-3-172 | 117 | CEMP-ET | Domestic Wastewater Treatment - Mobilization Construction | 11 May 84 | |
| EM 1110-3-173 | 038 | CEMP-ET | Sanitary and Industrial Wastewater Pumping - MobilizationConstruction | 09 Apr 84 | |
| EM 1110-3-174 | 031 | CEMP-ET | Sanitary and Industrial Wastewater Collection -Mobilization Construction | 09 Apr 84 | |
| EM 1110-3-176 | 019 | CEMP-ET | Incinerators - Mobilization Construction | 09 Apr 84 | |
| EM 1110-3-177 | 033 | CEMP-ET | Sanitary Landfill - Mobilization Construction | 09 Apr 84 | |
| EM 1110-8-1(FR) | 139 | CECW-EH-D | Winter Navigation on Inland Waterways | 31 Dec 90 | |
| EM 1110-35-1 | 124 | CEMP-DE | Engineering and Design: Management Guidelines for Working with Radioactive and Mixed Waste | 01 Jul 05 | |
| EM 1125-2-312 | 094 | CECW-D | Manual for Instructions - Hopper Dredge Operations and Standard Reporting Procedures, ENG 2590 | 01 Dec 53 |
|
US Army Corps of Engineers Internet Publishing Group:
Additional points of contact for our Web readers Page updated: 4 Aug 04 |